FLOODPLAIN PLANNING BASED ON STATISTICAL ANALYSIS OF TILPARA BARRAGE DISCHARGE: A CASE STUDY ON MAYURAKSHI RIVER BASIN

Autores

  • Vibhash Chandra Jha VISVA-BHARATI UNIVERSITY
  • Haraprasad Bairagya Visva-Bharati University

DOI:

https://doi.org/10.14393/RCG134317341

Palavras-chave:

Flood Frequency, Gamble’s Method, Return Period, Floodplain zoning

Resumo

Floods in the West Bengal are responsible for colossal loss of human life, crops, and property. In recent years, various measures of flood control and management have been adopted. However, flooding in such rivers like Brahmani profoundly challenges flood-hazard management, because of the inadequacy of conventional data and high spatio-temporal variability of floods. To understand flood hazards and environmental change it is imperative that engineers and hydrologists utilize historical and paleoflood records to improve risk analyses as well as to estimate probable maximum flood on rivers such as these in a highly flood-prone region(Parkar,2000). The flood frequency analysis, probable peak discharge analysis, its return period analysis and floodplain zoning based on ancillary data will help better management of flood in the Mayurakshi River basin situated in the districts of Birbhum and Murshidabad.

Downloads

Não há dados estatísticos.

Downloads

Publicado

15-09-2012

Como Citar

JHA, V. C.; BAIRAGYA, H. FLOODPLAIN PLANNING BASED ON STATISTICAL ANALYSIS OF TILPARA BARRAGE DISCHARGE: A CASE STUDY ON MAYURAKSHI RIVER BASIN. Caminhos de Geografia, Uberlândia, v. 13, n. 43, p. 326–334, 2012. DOI: 10.14393/RCG134317341. Disponível em: https://seer.ufu.br/index.php/caminhosdegeografia/article/view/17341. Acesso em: 23 dez. 2024.

Edição

Seção

Artigos