ANÁLISE TÉCNICA E FINANCEIRA DE USINA HÍBRIDA EÓLICA FOTOVOLTAICA

Autores

  • Ronaldo Pereira Baracco Forjaria Uniforja. Rua São Nicolau, 210 - Diadema
  • Sérgio Ricardo Lourenço Universidade federal do ABC, UFABC. Avenida dos Estados, 5001 - Santo André - SP. CEP 09210-170
  • Ronaldo Savarino Levenhagen Universidade Federal de São Paulo, Unifesp. Rua Professor Artur Riedel, 275 - Diadema, SP, CEP 09972-270.
  • Douglas Alves Cassiano Universidade federal do ABC, UFABC. Avenida dos Estados, 5001 - Santo André - SP. CEP 09210-170

Resumo

Neste estudo foi feita uma análise técnica e financeira de uma usina híbrida eólica fotovoltaica instalada na cidade de Caetité, BA. A análise tem o objetivo de verificar a influência da taxa de financiamento anual no custo de instalação e custo de geração de energia da usina híbrida com utilização do software Homer Energy®. De acordo com as estimativas, a irradiação solar e a velocidade média do vento em Caetité podem favorecer a instalação de usinas híbridas na região. Na simulação, para uma taxa real de 1% ao ano, velocidade média do vento e irradiação média de Caetité, o custo médio encontrado seria equivalente a R$ 0,127 o quilowatt gerado. Para a região de Caetité destaca-se uma instalação de 9 MW (megawatts) pico de tecnologia fotovoltaica e 18 aerogeradores VESTAS com capacidade de 1,65 MW cada, ou seja, potência total instalada nominal de 38,7 MW. Estima-se um custo de geração de energia equivalente a R$ 0,123 o quilowatt, que representa o melhor resultado encontrado entre todas as configurações apresentadas. Os resultados apresentados demonstram diversas configurações para usinas híbridas eólica e fotovoltaica instaladas em Caetité, que contribui no entendimento dos custos de instalação e geração de energia na região. Palavras-chave: Usina Híbrida eólica fotovoltaica, Energia Eólica, Energia Solar, Geração de Energia. ABSTRACT This study aimed to make a technical and financial analysis of a wind-photovoltaic hybrid power plant installed in the City of Caetité, BA, Brazil. The analysis aims to verify the influence of annual funding rate in the cost of installation and cost of the hybrid power generation plant. In this paper, it was used as a modeling tool the Homer Energy® software. According to the results, the solar irradiation and the average wind speed Caetité may favor the installation of hybrid plants. In the simulation, for a real rate of 1% per year, average wind speed and average irradiation Caetité, found the average cost would be equivalent to R$ 0.127 per kilowatt generated. For Caetité region posting an installation of 9 MW (megawatts) peak photovoltaic technology and 18 wind turbines VESTAS with a capacity of 1.65 MW each, that is, the total nominal installed capacity of 38.7 MW. It is estimated a cost of equivalent power generation to R$ 0.123 a kilowatt, representing the best result found among all displayed settings. The results show various configurations for wind and photovoltaic hybrid power plants installed in Caetité. Contributing to the understanding of the installation and power generation costs. Keywords: wind-photovoltaic power plants, Wind Power, Solar Energy, Power Generation.

Downloads

Não há dados estatísticos.

Biografia do Autor

Ronaldo Pereira Baracco, Forjaria Uniforja. Rua São Nicolau, 210 - Diadema

Possui graduação em Engenharia de Controle e Automação e Mestrado em Energia.

Sérgio Ricardo Lourenço, Universidade federal do ABC, UFABC. Avenida dos Estados, 5001 - Santo André - SP. CEP 09210-170

Possui graduação em Engenharia de Produção Metalúrgica e Doutorado em Engenharia.

Ronaldo Savarino Levenhagen, Universidade Federal de São Paulo, Unifesp. Rua Professor Artur Riedel, 275 - Diadema, SP, CEP 09972-270.

Possui graduação em Física e Doutorado em Astronomia.

Douglas Alves Cassiano, Universidade federal do ABC, UFABC. Avenida dos Estados, 5001 - Santo André - SP. CEP 09210-170

Possui graduação em Engenharia Química e Doutorado em Engenharia.

Downloads

Publicado

2016-05-13

Edição

Seção

Engenharia Elétrica